Projects
Our Projects
Latest Works
HVDC Connection 1000 MW ± 500 kVcc –Italy–Montenegro in Lastva Grbaljska – Project MONITA
HVDC connection allows interconnection between Italian and Montenegrin 400kV electric grids. Execution of new connection between Italy and Montenegro allows exchange of electric current between Montenegro and Italy, also increasing operative reliability which guaranties increasing ability of mutual support on both sides.
Urgent measures on the rehabilitation of 5 concrete prestressed bridges on the Vrbnica-Bar railway line in Montenegro
The overall objective of the assignment and of the project is to safeguard the functionality of the railway line Vrbnica-Bar and to increase its operational speed to the initial design speed (80 km/h) and reduce travel time. The Works Contract is based on the FIDIC “Conditions of Contract for Construction
Emergency Infrastructure Rehabilitation Project II: Consultancy Services for the Design and Construction/Supervision of Slope Protection Measures on the Nikšić–Podgorica Railway Line
Raise the level of safety and reliability of railway traffic on the 56.78 km of open track between Niksic and Podgorica by drastically reducing the risk of landslides and rock falls which potentially block and seriously damage the rail infrastructure and could well result in train collisions and loss of lives. The Works Contract is based on the FIDIC “Conditions of Contract for Construction
Technical Control on project of Reliability and Safety Improvement of “Bar-Vrbnica” Railway line – phase 2 (Concrete Bridges), 90 Main Designs for Rehabilitation of Concrete Bridges
The overall objective of the assignment and of the project is to safeguard the functionality of the railway line Vrbnica-Bar and to increase its operational speed to the initial design speed (80 km/h) and reduce travel time.